Comflor 210 , Comflor 60 , Comflor 80 Composite Floor Deck Equivalent Metal Sheet Machine Existing

Comflor 210 , Comflor 60 , Comflor 80 Composite Floor Deck Equivalent Sheet Machine Existing

ComFlor 210, 60, 80 series floor decking machine has been much copied but always classified. The steel decking supports the wet concrete and construction loads. Temporary propping is eliminated and steel lost formwork is left in situ which gives fast, easy construction. The concrete slab requires full structural bar or mesh reinforcement. The wide range of Tata Steel formwork profiles ensure the optimum solution is available. Specifications:
Name steel decking formwork
Base material Hot Dipped Galvanized Steel Sheet
Steel Grade G500
Yield strength 500MPA
Thicknes 0.8 -1.5mm(normal 0.8,1.0,1.2)
Zinc coating 275g/m2
Wave Height 75mm etc
EffectiveWidth 600mm
Length 0-11.8m
Less than 5.8m load in 20GP
5.8m-11.8m load in 40GP
Packing Bundle ,water-proof package with steel belt
Delivery time 20 days after confirmation
  Following are some of typical profiles available in market:
  1. Closed type galvanized steel floor decking
YXB51-200-600
YXB65-186-558
YXB60-253-760
YXB60-180-540
YXB51-200-600
YXB65-186-558
(2) Opened type galvanized steel floor decking YX75-230-690
YX75-200-600
YX38-152-915
YX51-305-915
YX76-305-915
YX75-230-690
YX75-200-600
YX51-250-750
YX51-335-1005
YX76-344-688
(3) swallow tail galvanized steel floor decking YX51-200-600
YX51-190-760
YX51-200-800
YX51-200-600
Especially the rebar truss metal floor decking, it features: Advantages: Easy On-Site Handling Steel decking is delivered to site in pre-cut lengths, and in pre-packaged bundles. The bundles can be easily craned into work areas, and the individual sheets quickly layed by hand. One truck can carry 1,000 sq metres of decking at a time, and a team can install up to 400 sq metres in a day. Speedy, Safe Construction A composite slab effectively acts as a safe working platform. Once the slab is poured, following trades can get on with their jobs below almost immediately. At the same time, work can continue unhindered on the floors above, allowing simple installation of services. Cable trays, ductwork and service pipes can be suspended neatly underneath the slab with purpose designed clips, brackets and hangers that locate easily and quickly into recesses in the steel decking profile. While FASEC Rebar-truss triangle welded metal decking system adapts rapid construction requirements of the main steel structure and provide fast work procedures. It can save a lot of construction time compared to traditional floor decking system. It can also improve the rigidity of the floor and save the amount of steel and concrete, so as to reduce the project budget. The Surface embossed increase the bonding of floor deck and concrete, make the floor deck system has high-strength bearing capacity. It is totally fire-proof and can span long without middle propping. So from cost saving and time saving view, the FASEC rebar-truss triangle welded metal decking system is better choice. However, in much of ready design, the deck is already designed and in avoiding of redesign, recalculation and re-submit/approval, we can also offer various customized steel floor deck profiles to cater for various contractors’ need, meanwhile we will offer various technical support in the aspects of load span and stress analysis etc. Warmly welcome various clients from International market to inquiry and visit us!