Gl Roof Multi Floor Prefab House - Kingspan Steel Bar Truss Girder Deck Composite Steel Flooring Formwork for Concrete Slab Mezzanine Construction – FAMOUS

 Kingspan Steel Bar Truss Girder Deck Composite Steel Flooring Formwork for Concrete Slab Mezzanine Construction

  The steel flooring formwork is a new composite steel floor decking design and it is widely applied for the mezzanine construction of commercial and civilian buildings, such as factories, hospitals, gymnasiums, schools, bridge projects and residential buildings. The steel flooring formwork is composed of two parts, the steel bar truss deck melted onto the galvanized steel sheet.   The steel flooring formwork is made of galvanized steel sheet and steel bar truss.  The metal floor deck can bear the construction load and be directly put on girders. After the simple rebar-tying work, the workers can directly pour concrete into the truss deck. The application of the steel bar truss deck greatly reduces the workload of mould putting and tear down. In a word, it can help increase the work efficiency and advance the project period.   Specifications:

Name

Steel flooring formwork

Base Material

Hot Dipped Galvanized Steel Sheet

Steel Grade

SGCC 

Yield strength  

Q235 or Q345 Refer to Standards GB/T1591-2008 

Thickness

0.8mm,1.0mm,1.2mm

Zinc coating

60-275g/m2

Wave Height

51mm-76mm

Effective Width

688mm-940mm

Length

0-11.8m

Less than 5.8m  load in 20GP 

5.8m-11.8m load in 40GP

Packing 

Bundle ,water-proof package with steel belt 

Delivery time

20 days after confirmation

  Advantages:

1. Steel bars are evenly arranged and the bearing mode is reasonable, which greatly reduces the engineering quantity of temporary support.

2. The double edge fold design can effectively ensure the quality of the engineering.

3. It can shorten the time by reducing 60% to 70% work load of binding steel bars.

4. It has the same mechanical properties and fire resistance as that of traditional cast-in-place floors. Because the bottom mould does not join in the load-baring, it is unnecessary to consider fire proof and anti-corrosion.

 

Applications:

1. Applied to precast slabs, pr-high-speed railway sleeper.

2. Used in many high-rise, ultra- high-rise steel buildings

3. Used for steel building, mezzanine floor of “LOFT”

4. The force applied to the complex, special-shaped structure, building

5. Used in-situ concrete structure(RC) buildings

6. Used in the construction of slope roof structure

 

Details:

 

 

Production Process:

 

Packing & Shipping

 

Welcome to send your enquiry about more technical specifications together!

 

 


  • Gl Roof Multi Floor Prefab House - Kingspan Steel Bar Truss Girder Deck Composite Steel Flooring Formwork for Concrete Slab Mezzanine Construction – FAMOUS Related Video: